Ability to Map Control Testing to Other Controls Where Controls and Testing are identical
Have the ability to test one control with all the necessary comments, documents and working papers. If this control and test satisfies other controls (which there are several redundant controls throughout the assessment) have the ability to "link" testing to other Domain/Controls and that control artifact will populate automatically. That would save a lot of time and redundant work.
1
vote
Beverly Waller
shared this idea
Each requirement statement has unique "asks" in its illustrative procedures (r2 assessments) or evaluative elements (i1 assessments). As such, each requirement will have unique tests, comments, documents linked, outcomes, scoring, etc.